Sign In | Join Free | My burrillandco.com |
|
Ask Lasest Price | |
Brand Name : | Katop |
Model Number : | 958 |
Certification : | CE,SGS, ISO9001:2008 |
Price : | |
Payment Terms : | T/T or L/C |
Supply Ability : | 1000 units per year |
Delivery Time : | within 30days |
I.Features&Benefits
1.Thevehicle usesthe excellentWEICHAISTEYRWD10G220E22engine whichis
reliable, lowinnoise andlowin oilconsumption.
2.Using the dual-pump flow-converging system, the hydraulic system
is substantially energy-efficient. The fully hydraulic
flow-amplified steeringsystemprovideseasy and agile steering.
3.The 360°panoramic cab provides an increase of interior space
by10% for maximum visibility. The cab uses the reinforced framework
and floor platform to keep drivers safe and comfortable in a
productive environment.
4.The plate-fin aluminium radiator provides the complete radiator
with higher strength and optimized heat dissipation performance.
The moreexcellent heat dissipation effect allows the vehicle
tooperate normally at 50℃ foralongertime.
5.Using the 4-plate support structure widely applied in Europe, the
front frame provides the complete vehicle with improved torsional
capacity by 56% to allow the vehicle to work more smoothly, thereby
substantially extending theservicelife ofthecompletevehicle.
6.Using the independent heat dissipation technology, the condenser
enables the air-conditioning system to improve refrigeration and
heating performance, thereby increasing the cab ventilation by 50%
and keeping the driverscomfortable.
7.The distance sleeve added between the two bearings allows the
bearing clearance to be adjusted strictly, increasing theservice
life ofarticulationby50%.
II.Specifications
Engine
Torque converter and transmission system
Tire
Steering system
Implement hydraulic system
Brake system
|
Payment terms & Delivery time &Guarantee time
1.Payment Terms:By TT. 30% deposit paid in advance, 70% balance
paid before goods dispatching from the factory;
2.Delivery Time:within 30 days after receiving deposit;
3.Guarantee Time:one year or 1500 working hours which comes first
after the date of B/L;
4.Shipping : 1 units one 40HQ container;or by RO-RO
![]() |